Operating Instructions for Multi-Fuel Asphalt Mixing Plant Burners

2023/05/10

Operating Instructions for Multi-Fuel Asphalt Mixing Plant Burners

Multi-fuel asphalt mixing plant burners must operate steadily and vigorously. Tires must be installed or unloaded separately. Rain protection, shock protection, and insulation work shelters must be set up. The construction site must be orderly, and the sedimentation pond must be drained regularly. Wastewater from cleaning machinery must be eliminated. The power connection of multi-fuel asphalt mixing plant burners must be correct. Solid-state leakage protection (or protective grounding) and contact-state leakage protection switch must be securely installed. The wiring and insulation of each component must meet requirements (by an electrician). The drive mechanism must be operated with clean, tighten, lubricate, adjust, and corrosion-proof methods. Every mixing machine must be carefully protected and maintained.

Before recommending the machine, you should check whether the clutch, brake, and various protective equipment are active and reliable, whether the steel wire rope is damaged, whether the track and belt wheel is excellent, whether FUS and ELAGE are balanced, and whether there are no obstacles around. If there are any abnormalities, it should be repaired before recommending the machine. During the 2-3 minutes of testing operation, check cylinder rotation and balance. It should not work abnormally, violate regulations, operate normally, and there should be no abnormal noise. At the suggestion of the machine, the driver must strive to work to maintain his position. Do not leave the workstation without permission, and always pay attention to mechanical operation. If abnormalities are found or abnormal noise is heard, the data in the cylinder should be released and the machine should be shut down for maintenance. When the hopper is lifted, it is prohibited to work or pass under it. The hopper foundation pit needs to be cleaned dry. It is necessary to contact the driver in advance. When the mixer is overhauled, it is necessary to block the power source. If it is necessary to enter the oil tank, someone should work in the electronic lockbox to prevent using the emblem and install special protective equipment to ensure that there is no accident sending electricity. After production is stopped, it is necessary to clean the pipeline promptly to prevent concrete adhesion. After the operation is finished, raise the hopper to the top position and connect it. Before leaving the site, pull down the electronic lock and lock it. The asphalt mixing plant burners and station burners are driven by the mixer arm, and the mixer blades drive materials in the tank. The mixing efficiency is high, with little residual material, and easy to clean. It is suitable for various assembly parts factories and industrial and civil construction projects such as highways, bridges, water conservancies, wharves, etc.

评论已关闭。